Stricto Project is a team of qualified engineers. We are focused on design of bridges, tunnels and other infrastructure buildings.

We also do road design and consulting in soil mechanics.

Since 2011.

Read more

WHY HIRE
STRICTO PROJECT?

  • We have been awarded by Estonian Road Administration as “The best in designing bridges 2016”
  • We are innovative and follow the latest know-how and regulations and our team participates in more than 20 seminars or courses.
  • We use modern workflow and software – we use 3D modelling for structural calculations and for geometry.
  • We are experienced to work side-by-side with construction companies during tenders – they have trusted us again and again.
Our portfolio

OUR PORTFOLIO

LÜGANUSE BRIDGE

2014

Luganuse bridge has a total length of 30 meters. It was interesting for us because it has an arch as a main structural element. The construction was carried out by Tallinna Teede AS.

KORU PEDESTRIAN BRIDGE

2016

Koru pedestrian bridge was designed using three different materials: steel for girders, timber for bridge deck and reinforced concrete for abutments. It has a span of 16 meters.

TÕRVANDI VIADUCTS

2013

Tõrvandi viaducts are situated near Tartu on one of Estonian main roads – Tallinn-Tartu-Võru-Luhamaa road (E263). The length of both viaduct is 21,5 meters. The construction was carried out by Nordecon AS.

VISUALIZATION OF MORE COMPLEX GEOMETRY

2017

3D visualization of more complex geometry helps to understand the shape of structure. Everyone can have on-site access to the picture using a smart-phone. A picture says more than thousand words ...

MÕNISTE BRIDGE

2015

Mõniste bridge has a total length of 32,5 meters. It was designed as continuous plate structure made of in-situ concrete. The construction was carried out by GRK Infra AS.

REINFORCEMENT OF AN ABUTMENET OF MÕNISTE BRIDGE

2015

3D model on reinforcement allows to calculate accurate specifications for rebar.

VASTSEMÕISA BRIDGE

2013

Vastsemõisa bridge was built as two-span buried steel structure, which also included water-level regulator and a pool for flow-control. The construction was carried out by Nordpont OY.

TÕDU BRIDGE

2017

Todu bridge was renovated by preserving the old structure. Thanks to 3D modelling it was easy to calculate accurate quantities and it came handy to visualize tricky joints during construction.

LEMBITU BRIDGE RENOVATION

2013

Widening of Lembitu bridge was designed in a efficient and feasible way. The construction was carried out by Nordpont OY.

OUR TEAM

Andreas Papp

CEO / Project Manager

MSc (TUT, 2013)
Diploma road engineer
EQF level 7

+372 58 100 608

Ando Funk

Chief Engineer

MSc (TUT, 2012)
Diploma road engineer
EQF level 7

+372 53 474 811

Tõnis Liigmann

Engineer

MSc (TTÜ, 2015)
Diploma road engineer
EQF level 7

+372 53 469 156

Juhan Idnurm

Consultant

PhD (TTÜ, 2004)
Chartered road engineer
EQF level 8

Taavi Kolts

Consultant

MSc (TTÜ, 2008)
Certificate of competence
nr 11110/14135

WE ARE LOOKING FOR NEW TEAM MEMBERS!

Send us your CV at
info@stricto.ee

Contact us

info@stricto.ee
+372 58 100 608
Laki tn 11e, Tallinn 12915, Estonia
Location on the map